Wednesday, January 10, 2018

A Dangerous Route in Need of An Alternative: US 129 from Ranger, NC to Maryville, TN

U.S. 129 has reached mythical status for mulleted middle-aged men in Harley's and younger guys in sports bikes shooting the 318 hairpin turns between Robbinsville, NC and Knoxville, TN, but it is a very poor location for a U.S. highway.  A quick Google search, in fact, does not even remotely recommend that U.S. 129 traffic even use that way at all to reach Maryville, TN en route to Knoxville from where it joins U.S. 64 in Ranger, NC.  Nonetheless, the highway that is popularly known as "The Tail of the Dragon" became enough of an issue that a proposal surfaced in the early 2000's to tear it all up for an interstate, I-3.  The interstate proposal was so unpopular that it basically got canceled, but that does not mean a better route is needed: just not there.


Seemingly endless hairpin curves in steep terrain greet drivers of U.S. 129 between Tapoco, NC and Chilhowee Lake in Tennessee.  While it provides unparalleled thrills for motorcycles, it is not such a thrill for through traffic.  Trucks are advised against using this route, and it is mostly useless as a through route for all but tourists and residents of Graham County, NC.  Note here in this image that the road is starting to slip toward Calderwood Lake.  The terrain here drops around 300'-400' on the right.  Photo from Google Street View.

The funny thing is, this is not truly a fixable highway.  It is located in very steep terrain with unstable and sulfuric Anakeesta rock.  It is also a dangerous passage along deceptively deep reservoirs holding back the Little Tennessee River, and it wiggles around very high mountains.  The damage building a modern four-lane road through there would cause would be incalculable.  This includes frequent landslides due to the massive cut and fill that would be required and the risk of poisoning a significant water source from the leeching of sulfuric compounds from the Anakeesta Rock.  In addition, hardly anybody wants any more interstates book-ending the Smokies: even the two-lane park road planned along Lake Fontana (Lake Shore Drive) was finally canceled a decade ago that was designed to replace a long-abandoned state highway (NC 288).  Google's simple map logarithm proves that this road should not even be U.S. 129 at all.  Politics yet again favored an unsuitable mountain crossing elevating a torturous mountain back road into a lengthy section of a major U.S. highway with a long and pointless overlap through Cherokee County, NC.  Lessons should have been learned from the costly disaster that I-40 was when it was slammed through Pigeon River Gorge, but the fix for this road is perfectly clear.


What Google thinks is that U.S. 129 is not the best way to Knoxville.  Even with the less than desirable conditions on TN 68, it is still a better and safer road than U.S. 129.  This is why perhaps U.S. 129 should be moved to the blue highlighted route shown.

Looking at this, it is obvious something needs to be done to change this: U.S. 129 needs to be moved.  For novelty purposes, keeping an alternate route of U.S. 129 along the existing road is an acceptable option.  Re-designating the entire route as U.S. 129 Alt from it current junction with U.S. 64/74 in Ranger, NC to its junction with U.S. 411 near Maryville is certainly an acceptable approach, and it keeps the U.S. 129 designation without marketing it to travelers as a major route.  Relegating it to a state highway is also an option.  While Tennessee can easily do this by revealing hidden TN 115, it is not so clear what to assign it in North Carolina since the original route number 108 as well as 115 are both accounted for elsewhere.  It is also bound to be unpopular due to the tourism that U.S. 129 on its current route attracts.  Perhaps the numbers should be switched so that NC 294 is reassigned to existing U.S. 129 north of U.S. 19/74 and Tennessee likewise renumbers TN 294 in Livingston to assign it instead to existing U.S. 129 so that it is all Highway 294 from U.S. 411 to U.S. 19/74.  I guess a public hearing should be conducted where they get to choose between NC/TN 294 and U.S. 129 Alt.

As to where the new U.S. 129 should go, the logical route is painfully obvious, and it is clearly marked in the map in light blue above.  This new route would be divided into the following segments:

  1. Overlap with U.S. 64/74 west from Ranger, NC to NC 294
  2. All of NC 294 from U.S. 64/74 to the Tennessee State Line
    • NC 294 would be decommissioned along its current route
    • The number 294 would be available to assign to swap with existing U.S. 129 north of U.S. 19/74 to the Tennessee State line
  3. Continuation of U.S. 129 onto TN 123 with 123 relegated to secret status from the state line to TN 68
    • A relocation of the junction of TN 68 and TN 123 is highly advised and is described further shortly
  4. The new route then turns onto and follows TN 68 from TN 123 to U.S. 411 (TN 33) in Madisonville
  5. U.S. 129 then overlaps U.S. 411 from TN 68 in Madisonville to the current junction of U.S. 129 (TN 115) southwest of Maryville.

GREATER NEEDS FOR TN 68 AND A RELOCATED US 129

TN 68 and NC 294 share a significant problem: while some spot upgrades have occurred over the years to streamline the hairpin turns caused by the ruggedness of the terrain, these are both steep and winding mountain roads through remote areas.  It won't be as simple as slapping a U.S. 129 shield on the new route: some improvements will have to be made.  One of those that is glaring is the junction of TN 68 and TN 123 with a peculiar movement favoring TN 123.  This movement requires TN 68 traffic at present to make a diagonal left turn, and if U.S. 129 was routed in from the opposite direction, it would force traffic to make a sharp right (or left southbound) to continue on what would be U.S. 129.  In fact, a closer look at Google has projected U.S. 129 traffic directed onto county-maintained Runion Road: a narrow, winding road that will need to be realigned and upgraded to highway standards to better align TN 68 to TN 123 just west of the state line.  A quick look at Runion Road reveals a paved cowpath that will have to be substantially rebuilt meaning that the reworking will take awhile.  This will drastically change the highways through the Turtletown community, if built.


The sharp switchback required to go from NC 294 to TN 68 north has resulted in Google routing through traffic onto an unsuitable county road known as Runion Road.  For U.S. 129 to go this way, Runion Road will need to be reconstructed and intersections realigned for it to work.


Here, Runion Road is straightened out with intersections realigned to make the new U.S. 129 the primary movement.  Because of this, it might make sense to also move TN 68 onto existing TN 123 to meet at the junction with current Runion Road.  While distance-wise it makes sense (and I would personally prefer it) to have TN 68 remain intact on the upper left, the reality is that the through movement is TN 123 and that it makes more sense to turn that section into a county road or short secondary route.  On the other hand, most of TN 123 would be decommissioned with exception to an unsigned portion between the relocated TN 68 and the state line.

The unfortunate thing about TN 68 is that somehow this highway has been ignored for substantial upgrades and is actually worthy of a study for a major relocation itself.  It is an incredibly scenic drive, and a side of me does not want to see it changed, but the fact is that this is the most suitable route to provide an inter-mountain connection compared to many other alternatives.  In fact, a realistic long-term prospect is to relocate I-75 onto this corridor through an interstate-grade road forking off of the current I-75 near Knoxville and following existing TN 68 south to meet the current U.S. 76/GA 515 west of Blue Ridge.  The existing GA 515 would then over a period of many years have intersections removed, interchanges constructed, and be upgraded to interstate standards including a new eastern by-pass of Ellijay and a shifting of the highway to create frontage roads so that the existing highway can become fully limited-access up until where the road is currently I-575.  I-575 would then revert into part of the new I-75.


The current route of I-75 steers traffic west/northwest.  While it has served its purpose well for many decades, it is increasingly congested and without a viable alternative.


Currently, the proposed route offers no time savings, and is only slightly shorter, but this is considering that on the Tennessee side, the road needs significant straightening and realignment.  That could cut as much as 15-20 miles off of the distance and provide a viable alternative if the Georgia side is upgraded to full freeway.  

In the short term, however, efforts should be made to straighten out the worst of the kinks.  While improvements for NC 294 are not as dire since significant investment has gone into upgrading the road, TN 68 is a different story.  Itself, TN 68 is 50 miles of hairpin turns between TN 123 (the Tennessee extension of NC 294) and the Tellico Valley (junction of TN 165 in Tellico Plains).  Large sections of road will either need to have the curves smoothed or the entire highway relocated to a better alignment.  In fact, the current condition of the road proves to be a major barrier between the Copper Basin (Copperhill) and Tennessee Valley.  On one hand, whatever improvements are made should be incorporated into a design that can be eventually upgraded to an interstate highway (super 2 or two lane on 4 lane right-of-way).  On the other hand, improvements should be minimal enough so that the existing road can remain in service as an alternate route when an interstate replacement is one day built.


Areas like the Hiwassee River crossing show that significant straightening of the road would greatly shorten the distance and increase the speed of the route.  On the right is a series of hairpin turns and switchbacks along the existing TN 68.  The proposed potential route on the left involve hill cuts and a high bridge over the Hiwassee River to straighten out this serpentine section.  Even if it not built to interstate standards or ever considered for a true APD corridor, simply relocating and straightening out the route as a two lane highway with passing lanes would greatly improve access to the area.  

A NEW APPALACHIAN DEVELOPMENTAL CORRIDOR

In order to finance construction of a new highway along TN 68 and GA 5 from Blue Ridge, GA to Madisonville, TN it is going to need a significant federal investment.  As it presently stands, funding for this corridor has been sparse at best.  It took 35 years just to even get the Copperhill/McCaysville By-Pass funded, and the project was scaled down from a four lane to a two lane!  Obviously, moving U.S. 129 will highlight the importance of the corridor further north, but initial improvements will mainly be to improve safety and connectivity.  Nonetheless, the delays in upgrading TN 68 pale in comparison to the delays in completing Corridor K, a very emotionally charged project that will likely only be built if public input is pretty much made non-existent.  Perhaps instead, funding can be steered to a corridor less emotionally charged and less scenic.  Corridor K travels through some of the most pristine country in the east as it traverses two deep gorges: Nantahala and Ocoee.  Ocoee Gorge is a significant treasure that people fear will be destroyed by construction of a new highway, but at present there is no suitable alternative.  Since GA 2 was canceled in the 1970's, and no other east-west links exist in the area, perhaps a high speed roadway running from the Georgia State Line to I-75 near Sweetwater would help alleviate some of these issues.  Think of how I-26 took pressure off of I-40 even though it goes in a more northerly direction and further east.  It is the same case with TN 68.


While not part of the U.S. 129 change, upgrades to TN 68 would overall be a very challenging project.  The area of Harbuck in particular is a squeeze point where either extensive cut and fill and disruption will be required in the Harbuck community or two tunnels will need to be constructed under Stansbury Mountain.  This is part of why building the road initially with only one carriageway (super 2) might be beneficial.  A tunnel would be half the cost if it's three lanes wide vs. two three lane wide tunnels.  Ideally, most of current TN 68 is kept intact as an alternate route if a new highway is constructed and kept on-system as a secondary state route.

Even if nothing like an interstate grade road is ever built, it would be a good idea to at least design an improved TN 68 that has the potential to become that.  Design it with right-of-way for a six lane highway with limited access on entirely new location with land set aside for future interchanges would be a start.  Considering that a potential of as much as three tunnels are needed, and significant cut-and-grade is needed, it is not a cheap project.  A significant investment was already made to rebuild TN 68 north of Tellico Plains, and this would simply be a continuation of that project giving a faster, more direct link between Tennessee's most geographically remote cities of Ducktown and Copperhill and the rest of Tennessee while providing a broader alternative to Knoxville.

HOW TO START THIS PROJECT

The initial steps to get the ball rolling for a small change leading to a big change is to recognize right away that U.S. 129 on its current route is not an acceptable route.  The steps of change are as follows:

  1. Reconstruct Runion Road into a new route for TN 68 that will be oriented to allow NC 294 to seamlessly transition into TN 68.
    • This will result in a relocation of TN 68 onto part of TN 123, resulting in the elimination of TN 123 except as a small hidden overlap with U.S. 129
    • Primary movement will be current TN 123 (east) to Runion Road on the south and TN 68 (north) to Runion Road on the north
  2. When this road project (approximately 1 mile long) is completed, relocate U.S. 129 onto this new route according to the previously described routing.
  3. Existing U.S. 129 will become either U.S. 129 Alt or downgraded to state routes depending on what both states decide.
  4. Curve realignment and the construction of truck/passing lanes from Turtletown to Tellico Plains should be conducted where practical to improve safety and speeds along the portion where U.S. 129 and TN 68 are co-signed.
  5. Once this project is completed, begin studies to construct an interstate-grade highway from U.S. 64/74 near Ducktown to U.S. 411 in Madisonville
    • This will be the first phase of a replacement for TN 68 
    • This does not involve U.S. 129 as much as it does TN 68 meaning that it will be a project exclusively in Tennessee
    • It may be constructed as a(n)
      • interstate-grade road (full freeway)
      • surface four lane expressway with ROW for future overpasses/interchanges and additional lanes (bridges should be constructed for six lanes)
      • super 2 (full freeway on a 2-3 lane undivided roadway)
      • surface two lane with interchanges built out for future expansion of remaining roadway
    • All designs should accommodate for an interstate-grade road containing six lanes meaning the super 2 should consist of three lanes with continuosly alternating passing lanes.
  6. When this project is completed, extend an interstate-grade road from U.S. 411 in Madisonville to I-75
    • This should be constructed to full interstate standards following TN 68 and include a high speed interchange with I-75 between Sweetwater and Farragut
    • It should be constructed with six lanes
    • It should be designed in a manner that allows large portions of Old TN 68 to remain on system as a secondary state route to serve the local communities of Coker Creek, Ironsburg, Farner, Turtletown, and Harbuck as well as the cities of Tellico Plains and Ducktown
    • It should include a realignment of Joe Brown Highway to meet the new road
  7. Georgia should begin upgrading existing GA 5/515 between Nelson and Blue Ridge to interstate standards by removing at-grade crossings and constructing interchanges
    • This will require relocation of portions of the highway to new alignment around built-up sections: especially in Ellijay and Blue Ridge
    • Existing ROW may have to be shifted to convert an existing carriageway into frontage roads and to reconnect old alignments into those frontage roads between Ellijay and Blue Ridge such as what currently exists in Cherry Log and Whitepath
    • While this is underway, a study for an interstate-grade road should commence between Blue Ridge and the Tennessee State Line following GA 5
    • The upgrades should include a widening of the existing four lane roadway to six lanes and realignment of substandard grades and curves where possible
  8. Long-term, Tennessee should complete the upgrade of the relocated TN 68 to interstate standards between the Georgia State Line and U.S. 411 in Tellico Plains to full interstate standards.
    • When completed, a six-lane interstate will connect from the end of I-575 in Nelson to I-75 west of Knoxville
    • I-75 will be relocated to this route with existing I-75 reassigned as extensions of I-24 and I-81

ADVANTAGES AND DISADVANTAGES OF THIS PLAN

What will start out as a simple highway shuffle will over time turn into a long and expensive road project, but it is necessary to create a more direct route between Knoxville and Atlanta while subsequently placing U.S. 129 onto a route more suitable for through traffic.  The major disadvantage of this plan is that it will introduce traffic and development into a scenic and remote area, but this area also suffers from a high level of poverty and very poor access.  It will also cut through mountains destroying the "wild" feel of the area, but this is no different than many projects underway in parts of North Carolina, Virginia, and West Virginia.  The benefit will be is that it will take the focus off of the more pristine areas further east along the existing U.S. 129 allowing it to be conserved for tourism and natural beauty while the less beautiful TN 68 corridor will function as a better route through the mountains than the current route involving U.S. 23, 74 and I-26 from Atlanta that is not designed to handle major interstate traffic and is becoming a worsening choke point through Asheville.  It will also provide substantial economic benefits to East Tennessee that are currently not offered due to a lack of an adequate north-south link.  No other route is suitable.  Any other option is long and dangerous with sharp curves through high mountains.  It is not something that will be completed for many years.  It will likely take as much as 30 years to study and build, so for that reason it is a good idea to start small and start now.

Tuesday, October 27, 2015

U.S. 72 Extension and Relocation in Alabama, Georgia and South Carolina

One thing that is truly missing across Appalachia and the Piedmont regions of Alabama, Georgia and South Carolina is proper east-west connectivity.  This is especially true north of I-20.  In particular, many have expressed for years the total lack of an adequate route connecting Atlanta and Huntsville.  Only two choices exist: a congested surface route along US 431 from Anniston to Huntsville leaving I-20 or a northern route crossing the Cumberland Plateau along a collection of entirely poorly marked and inadequate highways.  Much of that traffic follows the northern route to avoid the congestion of the southern route.  While the construction of such a route is decades away, the bigger problem is that no clear route exists connecting the two cities.  However, Google Maps has laid that out for us, and this route is not lost on the truckers that already use it.  While currently inadequate for major traffic, it is still built to adequate standards to become a U.S. route: a plan that hopefully will also emphasize the need to invest more in the upgrades of this route as well as improving the horrible east-west connectivity across North Georgia.

In addition, an oddity exists extending from Athens, GA to Rock Hill, SC in that a tri-state highway exists that just happens to carry the route number of 72: a hint that perhaps planners envisioned an eastward extension of US 72 that never actually happened.  This is highlighted by the fact that the number does not change in two states and that Georgia in particular placed the route under high priority with substantial upgrades from Athens to the South Carolina border.  In between are several very major routes that inexplicably only carry state route numbers.  If this route does not justify an upgrade in status to U.S. highway, then what does?


U.S. 72 at present goes through Stevenson, AL connecting Chattanooga to Huntsville, but the real need present is to connect Huntsville to Atlanta.  A simple fix to this portion of U.S. 72, including the portion through Stevenson, can allow U.S. 72 to be relocated to a much longer route of much greater need through large portions of Georgia and South Carolina than the present route in use today.

The U.S. 72 extension is a practical plan that would be handled in four phases.  They are as follows:


  • The first relocates U.S. 72 in Northeast Alabama along several routes from Scottsboro to Adairsville in Georgia.
    • Existing U.S. 72 north of Scottsboro would then become an extension of another U.S. route that currently ends in a very random place: U.S. 74.  
  • The second extends U.S. 72 east from that terminus from Adairsville to Gainesville in Georgia transforming portions of GA 20 and almost all of GA 369 to a U.S. highway.
  • The third portion basically connects the route to GA 72 in Athens via an overlap with US 129.  It then changes GA 72 and SC 72 into US 72 extending the highway from Athens to I-77 in Rock Hill, SC.  
    • Due to GA's unusual rules with state overlaps of U.S. routes, GA 72 would become the unsigned state overlap equivalent (US 72/GA 72) thus creating the only instance where a U.S. and state overlap share the same number like it is in 46 other states.  
    • A portion of US 72 will need to be located on SC 121 meaning existing SC 72 into downtown Rock Hill will need to be reassigned as US 72 Spur.
  • The fourth portion would require new construction extending SC 72 to an eventual eastern terminus and reunion with US 74 in Monroe, NC.
    • This portion would likely be limited access and will require a new bridge over the Catawba River
    • It will most likely follow or parallel NC 75

The new U.S. 72 routing would follow the following routes:

PHASE 1: SCOTTSBORO, AL TO ADAIRSVILLE, GA

This route would follow the following state routes:
  • AL 35 from existing U.S. 72 in Scottsboro to AL 40
  • AL 40 from AL 35 to AL 117
  • AL 117 from AL 40 to the Georgia State Line
  • GA 48 from the Alabama State Line to U.S. 27 in Summerville
  • Overlap with U.S. 27 from Summerville to GA 140 in Armuchee
  • GA 140 from U.S. 27 in Armuchee to I-75 in Adairsville

Looking at Adairsville to Huntsville (I-75 to Huntsville), the proposed U.S. 72 route is chosen by Google despite curves, hills and slower speeds than the alternative through Chattanooga (Image from Google Maps).


However, what is MORE striking is that when the route is extended to Atlanta, this route is STILL preferred over all other alternatives.  This means that these lowly state routes are in actuality carrying U.S. highway traffic (Image from Google Maps).

PHASE 2: ADAIRSVILLE TO GAINESVILLE

This route would follow the following state routes:
  • I-75 from GA 140 in Adairsville to GA 20 in Cartersville
  • GA 20 from I-75 in Cartersville to GA 369 near Lathemtown
  • All of GA 369 from GA 20 near Lathemtown to I-985 in Gainesville 

The route from Adairsville to Gainesville is clearly defined by Google matching up with typical truck routes of today.  It avoids windy GA 140 east of Adairsville instead following a portion of I-75 to Cartersville then following existing GA 20 and 369 to Gainesville (Image from Google Maps).


PHASE 3: GAINESVILLE TO ROCK HILL, SC

While less important than the two western legs, the need for the route extension further east is still viable.  It presents a badly needed east-west link for traffic as an alternative to traveling through Athens and as a means for bringing economic opportunity to parts of Northeast Georgia overlooked due to the lack of decent east-west routes.  The eastern phase also presents a unique and coincidental situation.  By sheer coincidence, GA 72 east of Athens is not only a major route but maintains its designation into South Carolina until its terminus in the southern suburbs of Charlotte.  U.S. 72 would ultimately assume this route replacing most of GA/SC 72 from Elberton eastward.

The route east of Gainesville is not so clearly defined, and part of this is due to a vital missing link east of Gainesville.  The connection and realignment of two county routes in Hall County would most likely correct this issue, but this does not necessarily mean that this correction is the most viable route.  Google analysis shows that three possible options are viable.  These options are:

  1. Route U.S. 72 along existing U.S. 129 to Athens then along all of GA 72 east of Athens meaning a full U.S. 72/GA 72 overlap.
  2. Route U.S. 72 along GA 98 from Maysville to Comer then along GA 72 east of Comer
  3. Route U.S. 72 along parts of GA 51 and 17 from Gainesville to Elberton in conjunction with other shorter routes.

Option 1:

The first option utilizes only existing state routes.  It follows:

  • U.S. 129 from GA 369 in Gainesville to GA 10 Loop in Athens
  • GA 10 Loop from U.S. 129 to U.S. 29
  • U.S. 29 from GA 10 Loop to GA 72
  • All of GA 72 east of U.S. 29 creating the coincidental U.S. 72/GA 72 overlap
This route is obviously the most simple to execute, but it has a distinct disadvantage in that it does not allow traffic to avoid Athens.  This means that U.S. 72 traffic would be forced into congestion related to Athens instead of by-passing it along less traveled routes through smaller cities and towns.  It is the least preferred option for that reason, but it does effectively establish all of GA 72 as a U.S. route as well as linking existing GA 72 to other routes.  In this plan, GA 316 should become the state overlap of all of U.S. 72 to avoid confusion and because the route would still be "Highway 72".

Option 2:

This option is probably the most logical route giving a completely direct east-west link with the fewest turns.  However, it does require substantial upgrades and intersection realignments where it passes through Hall County.  It also will require a renumbering of the westernmost portion of GA 72 between Athens and Comer.  It follows:
  • Old Cornelia Highway from I-985 to Joe Chandler Road (part of Old U.S. 23)
  • Joe Chandler Road from Old Cornelia Highway to GA 52 
  • GA 52 from Joe Chandler Road to GA 98 in Maysville
  • GA 98 from GA 52 in Maysville to GA 72 in Comer
  • GA 72 from GA 98/22 in Comer to South Carolina State Line

The GA 98 routing gives the most direct east-west route from Gainesville to Elberton helping drivers find a suitable alternate to driving through more congested Athens.  It also helps better locate larger cities such as Commerce and the small Madison County seat of Danielsville.  However, it faces limitations from the need for costly upgrades along the portion between Gainesville and Gillsville since the route follows existing county roads (Image from Google Maps).

Note that this route cannot be added as-is.  Several significant changes would have to be made to make it work.  First would be major upgrades to Joe Chandler Road.  This would include intersection realignments at GA 52 and Old U.S. 23 to make Joe Chandler Road the primary movement, lane widening on Joe Chandler Road, an intersection improvement with East Hall Road and completion of an already programmed bridge replacement.  In addition, both county sections would also become an extension/relocation of GA 98.  Also, two routes would have to be renumbered to make this work.  The first is existing GA 98 north of GA 52, which is recommended for a reassigned GA 207 (out of use for 30 years).  The second is the renumbering of existing GA 72 west of where U.S. 72 joins the route in Comer.  The route can no longer carry the GA 72 number under this plan due to excess confusion.  However, several good candidates are available.  These include:
  • GA 316 eastward extension along part of GA 10 Loop and all of GA 72 including the portions overlap with U.S. 72
  • Re-designation of GA 350 along all of GA 72 including the portions overlapped with U.S. 72
  • Re-designate the existing parts of GA 72 not included in the new U.S. route as U.S. 72 Spur
  • Designate existing GA 72 south of the proposed route and part of U.S. 129 west of Athens as U.S. 72 Alt
  • Extension and relocation of GA 53 along GA 316 and part of GA 10 Loop to overlap all of GA 72 including the portions overlapped with U.S. 72.  Existing GA 53 south of GA 316 could be renumbered or transferred to local maintenance.
Option 3:

This option is the northernmost option and would offer likely the greatest benefit as an east-west alternate route.  However, the existing roadways were not designed to carry an east-west route and would thus require substantial reconfiguration to make work.  Most of this would be west of I-85.  This route includes:
  • Old Cornelia Highway from I-985 to Joe Chandler Road (part of Old U.S. 23)
  • Joe Chandler Road from Old Cornelia Highway to GA 52
  • GA 52 from Joe Chandler Road to GA 323 in Gillsville
  • GA 323 from GA 52 in Gillsville to GA 51
  • GA 51 from GA 323 to GA 145 in Franklin Springs
  • GA 145 from GA 51 to US 29/GA 8 in Franklin Springs
  • Overlap with US 29/GA 8 from GA 145 to GA 17 in Royston
  • GA 17 from US 29 to GA 72 in Elberton

The GA 51 routing is considered because at present it recommends routing traffic along a long overlap with I-85.  While this is an acceptable option, it provides no benefit for communities near the route and dumps addition traffic onto I-85 that is already congested.  However, the route shown here does not consider using county road such as Joe Chandler Road.  The map below shows the same route with the modifications including distance and time to show the advantage especially after upgrades are made (Image from Google Maps).


The second map shows the GA 51 routing removing the barriers presented with routing traffic along an existing county road.  However, the upgrades required west of I-85 are significant and costly compared to the second option that includes only upgrades to Joe Chandler Road (Image from Google Maps).

In addition to the corrections along Joe Chandler Road, significant intersection realignments would be necessary to make this new routing work effectively, handle truck traffic and save time in comparison with other routes.  These upgrades would include:
  • Reconfiguration of intersection at GA 52 and GA 323 in Gillsville to make GA 323 the primary movement and/or construct a traffic circle.  If a higher speed option is chosen, this would require a short by-pass on the NW corner of the two routes.
  • Reconfiguration of the intersection of GA 51 and GA 323 creating a new roadway on the SE corner of the intersection between the two routes.  The new roadway would close the existing GA 323 east of that point and would make GA 323 the primary movement requiring GA 51 traffic to turn off of the new road
  • Realignment of GA 51 intersection at Historic Homer Highway (Old U.S. 441) in Homer to make GA 51 the primary movement
  • Construction of a traffic circle at the junction of GA 51 and 145 in Franklin Springs
  • An improved roadway connection in Royston possibly including the state takeover of Cook Street or a new southwest bypass
  • The construction of a full diamond interchange at GA 17 and 72 in Elberton
PHASE 4: SOUTH CAROLINA EASTWARD: WHERE DOES IT GO?

From Elberton, the route would continue along GA 72 eastward to the South Carolina line.  In South Carolina, the following takes place
  • Route in South Carolina follows all of existing SC 72 until SC 121 in Rock Hill
  • From there, U.S. 72 overlays existing SC 121 from existing SC 72 to its eastern terminus at U.S. 21 with an overlap of U.S. 21 to end at I-77.
    • Existing SC 72 into downtown Rock Hill would become U.S. 72 Spur
  • An eventual eastern extension may one day be possible to end at U.S. 74 in Monroe, NC via a new roadway connecting NC 75 to SC 122
    • This new roadway should be preferably limited access, especially on the new portions
    • A southern route connecting U.S. 21 east of I-77 to NC 75 may also be considered


The map above shows where US 72 would end in Rock Hill (following SC 72 and 121) and the proposed eastward extension.  The northern route in magenta following SC 122 connects the road as a surface highway to NC 72.  The southern route forking off of US 21 would be a freeway or expressway on new alignment ending at an interchange with US 74 east of Monroe.  This new route would create a southern connector from fast-growing Rock Hill to US 74 east of Charlotte.

WHY IS THIS NEEDED?

Northern Georgia and Northern Alabama have been known for many years to have poor east-west connectivity and part of that is due to the lack of a single major route to prioritize upgrades along.  Travelers from Alabama to South Carolina north of Atlanta at present have not a single U.S. route other than mountainous U.S. 76 and rely on a confusing splicing of state routes.  In neither South Carolina nor Alabama have any corridors been developed along these routes with by-passes or four lane sections that are needed to better manage traffic leading to a lack of development along these corridors and dangerous traffic situations as large trucks are using inadequate roads.  This state routes have not been unified in any logical fashion, do not indicate badly needed turns, have not been upgraded in such a fashion to better manage long distance travel and receive weak funding priority due to their lowered status as regional state routes instead of major intrastate routes.  In addition, Georgia has also not added a single mainline U.S. route in over 50 years relying instead on state route "corridors" such as the 500 series GRIP corridors that do nothing but contribute to public confusion.  Fewer designations are needed, and major routes in the state should be part of the U.S. route system in the majority of cases with the GRIP designations dropped due to their needless overlaps of already present routes.  

In fact, the politics of GRIP corridors do not actually line up with route importance in this case.  While the Scottsboro to Adairsville route has the highest need, it has received low priority for improvements by both Alabama and Georgia who both effectively treat it as a regular surface state route.  For instance, GA 48 is shown as a minor arterial instead of major arterial and has received very low priority for upgrades.  In contrast, GA 72 from Athens to the South Carolina line is not only a GRIP corridor but shown as a major arterial.  Some portions are only classified major collector such as GA 369 in Forsyth and Cherokee Counties.  All portions of this route should be reclassified as major arterial along with a renumbering to U.S. 72.

WHAT ABOUT OLD US 72?

Most of U.S. 72 north of Scottsboro does not follow a logical east-west direction before becoming essentially an unnecessary overlap with U.S. 41 and U.S. 64 in Jasper east of I-24.  In Chattanooga, U.S. 72 unceremoniously enters city streets terminating at the exact western terminus of U.S. 76: two east-west U.S. routes ending into each other!  It's a logical fallacy that came as a result of extending routes without thought as to where they would terminate.  U.S. 76 itself is mostly overlapped with U.S. 41 west of Dalton making it extend miles beyond its logical western terminus, so U.S. 74 makes the most sense to replace it.  U.S. 74 at present ends at the junction of I-75 and I-24, but it is not signed past its interchange with I-75 near Cleveland.  By signing U.S. 74 and extending it westward along I-24, U.S. 74 can easily and cheaply replace U.S. 72 between I-24 in Jasper and AL 35 (proposed U.S. 72 relocation) in Scottsboro.  Better yet, extending U.S. 74 effectively ties two APD corridors together: Corridor K and Corridor V.  In no way is the importance of Corridor V diminished, and in fact U.S. 74 becomes effectively a longer route tying Huntsville to Cleveland, TN through Chattanooga.  This extension effectively eliminates at least two logical fallacies leaving only U.S. 76 to correct (which will likely come later since a new route is planned from Dalton to Trenton that could carry U.S. 76 on a better route).  It also better unites two corridors that function much like surface interstate highways.


Corridor K and Corridor V can be linked together in a logical fashion by simply extending U.S. 74 westward along I-24 to take over U.S. 72 up to the relocated portion in Scottsboro (Image from Google Maps).

WHY THIS IS BETTER

Moving U.S. 72 onto these major routes through Alabama, Georgia and South Carolina will only consolidate what people have already known for years, but the purpose will be better travel and hopefully greater emphasis on upgrading this very substantial yet substandard route.  Most sections of this route are long overdue for a major overhaul including four laning, interchanges, new by-pass sections and intersection relocations to better reflect traffic patterns.  Unclear routes also discourage economic activity in all of the cities along this route due to difficulties involved in shipping and commerce.  At this point, the plan is simply to add a number to existing roads, but the hope is that in the future it will improve the economies and connectivity of all cities along its route.  

Friday, March 6, 2015

Mileage Caps vs. Proportional Ratio Caps

Caps are often a popular method to manage things that seem to be growing out of control.  While they seem logical, it is important to think about a particular cap that this country has set that has not worked.  That cap is on the number of members in the House of Representatives.  Set in 1911, no more than 435 members are allowed in the House despite the country more than tripling in population since that time.  The result of this completely arbitrary cap has been massive gerrymandering that has led to severe political corruption, partisan gridlock and poor representation.  As evidenced by this misguided law, strict caps based on a randomly chosen number are a bad idea.  Let's imagine instead that a proportional cap had been created on Congress.  If that proportion was set based on the growth of the US population since 1911, today we would have 1,485 members of the House meaning far more local representation, less gerrymandering and the chance for competitive third parties to bring accountability to the electoral process.  Mileage caps for roads have a similar detrimental effect corrupting the way that states do business with local governments.

THE INSIDIOUS MILEAGE CAP: BAD TRANSPORTATION POLICY

The example with the House of Representatives has nothing to do with roads, but the concept of arbitrary caps does.  In this case, it is the mileage cap used by states to limit highway system expansion to a set mileage.  The mileage cap is essentially a state agency deciding that they will no longer accept any new miles into the state highway system regardless of overall gains in road mileage.  Usually when these caps are created, it is done as a hasty action as a means to stop the bleeding of funds for a road system that was growing past the point of efficiency or as a means to reign in politically motivated roadways that never had any reason to be on the highway system and were not otherwise part of a special farm-to-market highway network.  Mileage caps are typically based on a completely arbitrary number that is set that essentially rounds off what just happened to be the approximate state highway system mileage at the time usually rounded off.  The result, however, has been hardship for local governments and leads to the slow, but proportional devolution of the state highway system.


Old US 19E north of Elizabethton, TN is an example of an old alignment that is maintained below standards.  Lines are faded out, guardrails are damaged and signs are in disrepair along this stretch of roadway that was turned to the local government in 1988.  It is still designated a collector route, but if a mileage cap had not been in place it may have remained on the state system as a secondary state route.  (Google Street View, May 2012).

Why is this bad?  These states with such caps use the "lane miles" argument to justify a continued devolution of the highway system, but evidence in these states is that the local funding ratio likewise does not increase in relation to the proportional decrease in state responsibility.  Lane miles will almost always increase regardless of who is in charge, and the "lane miles" argument is a weak one since population and thus the state's tax base also increases in conjunction with added lane miles.  If the state doesn't want more lane miles, then they can always choose to build, widen or pave fewer roads focusing funding instead on operational improvements.  This Trojan Horse argument has nothing to do with the unfunded mandate known as the mileage cap.  In addition, far more miles go to the local governments than the mileage indicates.  This is because every time a new road is built and added to the state highway system, some road must be downloaded to the local government, especially when a roadway is entirely new construction instead of a relocation of an existing highway.


Old GA 184 was turned to local maintenance in 1989 as a result of mileage swaps.  It was turned to Banks County who clearly does not have sufficient means to maintain it.  It is a major collector route.  While the state has funded significant improvements to the road since this image was captured, the fact is that that the road was in a neglected, unsafe condition for over 25 years because it was transferred to a county unprepared for that responsibility.  (Image from Google Street View, May 2014).

Local governments are still largely dependent on state funding, and local governments are generally not the most efficient means of maintaining arterial and major collector roads.  This was detailed in the Farm-To-Market Cooperative Plan.  When the state sets a mileage cap, it does not just mean that an old highway alignment is placed on the local level when a new road opens.  It also means that other highways, usually in rural areas, are also turned to local maintenance.  With no additional funding or state maintenance, roads like this tend to fall into disrepair under local control.  This is especially true when local policies and practices for road maintenance are already weak meaning that these local agencies are not going to make any special effort to maintain a former state highway vs. other local roads.  The need to "swap" roads simply leaves local governments with the cost of maintaining a road that they never built in the first place that they likely also lack sufficient means to maintain.  In all, it is a bad transportation policy and it weakens the abilities of local governments to manage limited funds by spreading available local funding even thinner.

What's also worse with mileage caps is that it prevents the road system from periodically being corrected to better adapt to new traffic patterns.  Roadways that no longer serve any statewide purpose are kept on the state system because the local agency does not want to lose those miles just to gain more on another road.  The states also start using these roads as "mileage banks" to withdraw at random just to deposit as added mileage for another new road meaning that the state has already deemed these older routes effectively useless.  Often times, a "lane mile" swap is even required thus a local agency is stuck with maintaining sections of roads twice as long as the new state routes.  Because of this, local agencies rarely propose any changes that would make sure that state routes actually line up with the best and most useful function.  If local agencies were not always threatened with losing state highway miles, this attitude would change and better routes would thus be developed.

THE RATIO CAP: A MUCH BETTER TRANSPORTATION POLICY

The ratio cap is a concept that balances the needs of the state with the needs of local governments.  If a local agency's road responsibility massively increases then likewise they should be seeing more roads turned to state control.  They shouldn't have to worry if it "meets state standards" or that they have to "swap out another road".  In fact, all counties and municipalities should be able to put out a wish list each year on qualifying roads to place onto the system with the state able to add them based on the greatest need.  The state then takes them over as-is and then makes the needed changes themselves.  Picture this example in "sample state".
  • Sample State created a mileage cap in 1980 that restricted the state highway system to 10,000 miles
  • In 1980, the sum of all public roads in the state was 80,000 miles
  • Since 1980, the public road system has grown since then by 20,000 miles to 100,000 miles
  • In 1980 the state ratio was 12.5% under state control
  • In 2010, it had since dropped to 10%
  • The state also built and took over maintenance of 2,000 miles of new roads thus transferring 2,000 miles of other roads from the state system to the local system
  • This means that local agencies have had to take on an additional 20,000 miles of roadways without any additional funding from the state to do so
  • This 20,000 mile mandate includes 2,000 miles of roads formerly maintained by the state
What is seen here is an incredibly unfair situation for the local agencies.  The state has essentially devolved 2% of the state highway system directly to the counties that they transferred to new road mileage while the counties have subsequently had to maintain 20,000 more miles of roads.  While the gas tax in sample state did not change, the available funding grew proportional to the population growth.  This means that essentially the state has created an unfunded mandate.  Local governments were not given an option of keeping these roads on the state system before, because the mileage cap was inflexible.  The state was adding 2,000 miles of newly constructed roads and had to take the mileage from other roads.  After much debate and frustration from local authorities, sample state caved and reversed their policy.  
  • Seeing that the state ratio in 1980 was 12.5% when the cap was created, the state agreed to expand the state highway system back to the ratio it was in 1980
  • The state will continue to maintain this ratio cap not exceeding 12.5%, but it will allow the road system to grow thereafter in proportion to total system growth
  • This means that 2,500 miles will now be added to the state highway system
  • 1,500 of the 2,000 miles turned to the local authorities are then restored to the state highway system since they were determined to remain of high enough functional classification and traffic volumes to justify restoring
  • 1,000 miles of new state roads along existing local roads are added with mileage shared evenly among all 10 state highway divisions so that each division is able to add 100 miles of local roadways to the state system
  • Many local agencies were then no longer torn between paving and upgrading miles of former state routes and other major local roads
  • In 2015, the public road system grew an additional 500 miles
  • Thus, the state allowed up to 63 more miles of roads to be added to the state highway system since 2010.  50 of those miles were new roads with a couple old alignments retained as business routes.  13 additional miles were distributed to all 10 districts with some used and some reserved for additional growth of the system.  
  • While the state's responsibility increased, proportionally it did not change from 1980 after the mileage cap was replaced with a ratio cap and the 1980 ratio restored.
MILEAGE CAPS AND FUNDING ISSUES

Many states that have mileage caps set these caps due to funding being inadequate, but is this really an excuse to place more responsibility on local governments that are suffering even more financially?  Is funding not going to increase with population?  In recent years very few states have grown their state-owned highway system at all.  Several have also recently begun turning back roads to local agencies at an increasing amount such as Colorado and Iowa.  States like Florida recently dropped below 10% for the first time since the 1940's.  If the states are unable to raise new revenues, that doesn't mean that they should make local governments suffer more for it.  The system should still be growing proportionally regardless of this, and the increasingly poor condition of state roads should only highlight the need to create new funding sources.  It is NOT an excuse to burden counties and cities with roads they have an even harder time affording.  While the proposals that State and Local Road Reform proposes are designed to promote more operational efficiency, improve safety and upgrade engineering standards they are not designed to repave roads.  The only way to repave roads when the money runs out is to raise more money.  Turning roads to the local level either through mileage caps or large-scale turnback events is not going to raise that money: it will only mean that local agencies will have to do more with less and that the road system will subsequently become less efficient.

It is understood that one of the reasons for mileage caps is to force counties to take over segments of old alignments that they would refuse to give up otherwise.  In states like Louisiana, Mississippi and Maryland it is not uncommon to see dead end roads, including old alignments with long-closed bridges, remaining on the state system.  However, this is a mileage distribution issue not a road mileage issue: it is a management issue.  The state DOT should have the authority to say "this road is not necessary for statewide travel and will be returned to the local government" while transferring that mileage to a road that does serve statewide traffic.  It is ridiculous to see roads that obviously serve a statewide purpose as county roads so that a road that no longer serves any purpose except as a two-lane driveway remaining on-system.  You see this sometimes in Maryland where a state primary route in Pennsylvania becomes a county road in Maryland while five sections of an old alignment nearby are still state highways.  Assuming that the county road has equivalent mileage to those segments, does it not make sense for the mileage to be transferred?    

REAL EXAMPLES

Several states have openly advocated and advanced policies to transfer roads to the local level regardless of mileage.  These mileage caps also tend to mean mileage is lost instead of maintained at the level of the cap.  Louisiana, Pennsylvania, South Carolina and Kansas are some of the most recent examples.  Analysis of the road systems in these four states between 1992 and 2012 show that:
  • Louisiana has instated a mileage cap with a net gain of only 12 miles
  • Pennsylvania has lost 4,629 miles in those 20 years (the system began scaling back mileage beginning with a large-scale turnback event in 1984)
  • South Carolina instated a mileage cap in 1993 but has officially turned back 245 miles
  • Kansas's state road mileage dropped by 356 miles despite a gain in local road mileage of 6,959 miles.
State ratios dropped, respectively, from 28.4% to 27.2% in Louisiana, from 37.4% to 33.2% in Pennsylvania, from 64.9% to 62.5% in South Carolina and 8.0% to 7.3% in Kansas.  It should be granted South Carolina is a unique situation with its high level of state responsibility, but is clear that most states today are not a friend to local governments in terms road funding and maintenance responsibility.  

Let's look at two states with known mileage caps comparing data that demonstrates the proportional decay of their state highway systems:

Indiana

Indiana is well known for its 12,000 mile cap on state highway mileage.  This cap keeps the system small in relation to other Midwestern states, and unlike its neighbors on each side, the state lacks a township road program to consolidate county responsibility to a few major roads.  While this might seem more efficient, these are still lower population counties.  The resulting county road standards unfortunately mirror the unpredictable conditions found on county roads throughout much of the Southeast with some more populous counties and cities doing a better job than others.  Regardless, the state has been so prudent that mileage is actually well below the mileage cap and declining.

In 1992, INDOT was responsible for 11,294 miles or 12.3% of the road system.  In 2012, that number dropped to 11,006 miles or 11.3 % of the road system.  This means that officially local governments had to take over 288 miles of former state roads, but the actual local road mileage jumped 5,234 miles since that time.  This means if a ratio cap had been set in 1992 at the rate it was then, the state road system should already be close to approaching 12,000 miles at 11,936 miles.  If the rate had been 12,000 miles then, the rate would have been 13.0%.  This means that system should have grown to 12,647 miles in that 20 year span: a modest net gain of 647 miles which would have at least retained state highway mileage as new roads were built.  Instead, local governments have had to take on nearly 300 additional roads instead of INDOT gaining around 650 miles.  The state would have not been hurt by this modest gain, but the counties and cities that lost these highways certainly were.  

What Indiana should consider is going back to the date when the mileage cap was instated and calculate the ratio in relation to what the total public system mileage was that year.  That ratio should then be calculated based on the current public road mileage to determine the correct road mileage that the state should be maintaining.  In this example, it was 13% but considering that the mileage cap was likely created during the 1960's or 1970's, the ratio is probably closer to 15%.  This means that 14,593 miles should be on the state highway system adding a sum of 3,587 miles.  

Georgia

For around 20 years Georgia enjoyed one of the best funded road networks in the Southeast due to an earnest commitment to use road funding for only roads.  Plentiful revenues were funneled into massive road projects all over the state meant to both keep up with the fast growth in North Georgia while attempting to improve the economic conditions in rural counties in other areas.  This also meant that the state highway system should have been growing to help the fast growing state keep up with the demand for new and wider roads.  Instead, GDOT has enforced a strict mileage cap since 1963 when the legislature panicked over the growth of the state highway system.  The cap in 1963 was put in place to force the state to maintain the roads they had built thus stopping the growth of politically-motivated state highways additions.  While that seemed like a good policy at the time, that did not mean that slow growth could not have continued since then.  

During the period of massive system growth via new construction during the 70's and 80's, the state likewise turned back between 1,000-3,000 miles of state routes to the local governments to funnel to these new roads.  Most of these highways were located in rural counties who lacked adequate resources to maintain them thus the condition of those roads declined markedly.  While the state later worked with counties to greatly improve the condition of the worn out pavement on those roads all throughout the 1990's and early 2000's and is now using federal-aid for safety upgrades, these aging roads are still proving too much for local governments to adequately maintain on their own.  In other words, the counties are not really doing much themselves to maintain these roads.  They're just waiting for the state to help them when at one point the state maintained them consistently.

While statistics for mileage cannot be located back to 1963, the mileage for 1967 is available.  At that time, the state system was around 18-19% of the total road system mileage with state system mileage not yet reaching the 18,000 mile cap until 1972.  The first data including city streets available was in 1975 and showed a state ratio of 17.9%.  That ratio has dropped today to 14.3%.  This means that in 40 years, the ratio of state control has dropped by 3.7% while the local road system has increased by 24,000 miles: an increase of 19.2%.  

What this means is that Georgia should have enacted an incremental increase of mileage over the past 40 years.  Based on 1975 statistics alone this comes out to at least 4,528 miles.  This mileage could place the majority of functionally significant former state highways back onto the state highway system as well as adding many new roads that are currently maintained by county and city governments.  This would thus relieve local governments of many expensive to maintain roads in both poorer rural areas and in areas with high traffic and population.  This averages to 28.5 miles of roads per county or 646.9 miles per GDOT district. 

If GDOT does not change any other policy, the state system should be expanded to more closely align with the original state control ratio in 1963.  This would mean the state assuming control of the thousands of miles of federal-aid secondary road projects they built.  Under this, the state ratio would also bump higher to around 20% meaning that 7,000 miles of state highways would fall under state control.  This would mean not only the restoration of all former state routes that remain today functionally classified as major collector or arterial roads but also the addition of many other major collector roads.  The highway system would then be allowed to grow proportionally to at least be adequate to not only prevent unjustified mileage swaps, but also to occasionally add new roads to the system.  

CONCLUSION

If the goal of states is to improve their state road system, then that state road system should have reliable mileage that is not gradually chipped away as the system grows with a commitment to place that mileage on the roadways that provide the greatest benefit.  This blog has demonstrated that roadways transferred to local governments are frequently maintained at well below the standards they were as state highways.  Local governments have also shown that they do not have the resources to expand their responsibility periodically onto more and more roads.  These states who have mileage caps in place need to revisit and revise their policy, preferably rectifying the mistake they made by replacing their mileage cap with a ratio cap.  Furthermore, they need to subsequently restore state ratios to their prior levels when the cap was put in place.  While states may feel strained from added mileage, this cost is a sunk cost.  Somebody has to maintain these roads, and the states are the ones best suited to do it or these roads would not have been state roads in the first place.

Thursday, February 19, 2015

Rethinking Local Maintenance: Returning to a Larger Statewide Role is the Best Strategy

The facts and figures do not lie.  Money is tight, and it's too tight for most local governments to properly finance or maintain roads in much of the country.  Rural counties in particular are finding budgets strained due to weakened economies and population losses, yet they remain responsible for roads that they have never had adequate resources to maintain in the first place.  When money is tight, the first line of action is to reduce overhead by sharing that responsibility with another public agency whether it is the state, an adjacent county, a city or any combination of these.  Why is this not being done?

Transportation demands today are also not the same as they were 100 years ago.  While the states may feel overwhelmed, the use of an antiquated method of service delivery is reducing flexibility and accountability on how funding is spent, draining state coffers for needless overhead costs due to the duplication of services and leading to a dearth of inspectors to make sure that maintenance and road projects are in compliance with sound engineering practice.  Even with their many great financial difficulties, the highly centralized road systems in the Carolinas, Virginia, Delaware and West Virginia still work, and they do because overhead costs are minimalized meaning that the most basic of maintenance needs are almost always met even if larger needs have suffered from a maintenance backlog.  In fact, the only real reason that the road systems in the Carolinas and Virginia are not among the top rated road systems in the country has much to do with politics: the states that have them are unwilling to invest in adequate tax rates to maintain them and are funneling sparse resources away from maintenance to large road projects and other non-road items.  At present, only North Carolina's road system is adequately funded since legislative gridlock has resulted in a refusal to introduce new funding sources to pay for roads in the other states with centralized road systems mentioned.

In contrast, the only states with local systems that work are states with either a very strong investment from a state level and/or very large counties that help better consolidate funding.  In other words, road systems like those that exist in states like Massachusetts, New Jersey, Illinois, Georgia, Tennessee and Kansas need to go.  It's time to find a better way than simply relying on a patchwork of local governments to do what they're supposed to do.  County, township and municipal governments when they were laid out were not designed with road maintenance standards in consideration.  They were formed before the automobile and have absolutely no basis in modern highway planning.  Most were never capable of managing their own highway departments independently.  In the nearly 100 years since state highway systems were first created, it should be pretty obvious by now that local highway agencies are a costly, inefficient organization.  Most are extremely dependent on state-aid to survive, and they do not maintain road systems to adequate levels to justify keeping these organizations in place at the levels they are today.  Just the fact that MUTCD compliance alone is very poor across the country shows that dependence on local governments to do what the state or a larger region can do better is pure stubbornness and misplaced idealism about the real role of local agencies.


A lack of professionalism is epidemic in local agencies, especially rural and poorer agencies who lack the resources to hire professional staff and adequately finance higher standard work.  This sign exemplifies a disregard for standards due to the county being too small to adequately police without any efforts made to place supervision under an agency capable of hiring engineers whose professional training would hopefully reduce sloppy work like this.

An article in Chattanooga's Times-Free Press highlights the difficulties that counties have in both maintaining roads and obtaining adequate funding to do so.  Planners always look at counties with high populations as examples of efficiency in local government and a shining example of local control while completely ignoring that the majority of counties across the US have low populations with tremendous economic difficulties.  While they may provide a public service, they are incapable of providing a well-rounded consistent approach due to an imbalance between available funding and the human resources needed to steer a local operation.  About the only way such counties can support their own road systems is by receiving a high level of state-aid: sometimes way more than larger counties receive.  States may have such programs such as LTAP technical assistance, but they are by no means a guarantee that the local agency is going to follow those standards, especially when it means greatly increasing costs and hiring outside help to do so.  For instance, nowhere in this plan to adjust gas taxes in Georgia were there any plans to reduce the burden on counties or cities.  In all of these counties mentioned, the local governments have roads maintained well below state standards and lack any significant means of raising additional funding.

HOW DID WE GET HERE?

The last time any serious effort was made to relieve local governments of heavy road responsibility was during the early 1950's.  During that time, the state's role in transportation was a recent invention and states flush with gas tax revenues, less trustful of local governments and less fearful of liability felt they could operate a large portion of the local road network far more efficiently at far higher levels than the individual local governments could.  At the time, the states who adopted such systems were taking over roads in counties that often had very low populations, could not afford to maintain the many new paved roads and were unable to support the new mandated road standards.  Federal-aid funds were also plentiful meaning that these large state takeovers were bundled with a major road building program until funding for such projects was cut beginning in the 1970's.

Unfortunately, most other states did not adapt this strategy when the federal-aid secondary program was fully underway.  Those other states began building massive secondary state highway systems with no intentions of maintaining them.  They were instead dumped on the local governments as soon as the asphalt cooled for the local agencies to maintain without either the funding nor knowledge on how to do so.  Rural counties and small towns in many states were suddenly in charge of these new roads when they were previously in charge of mostly unpaved roads that required neither significant funding nor technical expertise to either build or maintain.  They were not prepared for this new responsibility.


Without substantial state-aid, federal-aid major collector roads such as this one are marginally maintained.  Local governments are typically not properly structured for this duty.

Unfortunately, the rush by the states to take over these new roads was not as strong as it should have been.  Most states across the country have strong local governments that resisted this move by the states, and state DOT's have consistently resisted any new responsibility choosing instead to continue to push more and more responsibility on the counties: both construction AND maintenance.  Traditional local control typically wins over central planning more often than not, because of fears of unfair redistribution of resources to favored parts of the state coupled with a belief that centralization will lead to much higher taxes than decentralization.  While history has proven that this is not necessarily true, there is something to be said about distributing resources across a larger state meaning a far too large state bureaucracy and imbalanced demands.  This is why the Regional Roads Plan was developed.

Local control is idealized in the USA as an extension of "states rights" in this misguided notion that the closer the government is to the people, the more responsive they will be thus the greater likelihood that they will do a better job.  This proved not to be true as many local governments have proven in many cases to be notorious for neglect and waste while even honest, well-meaning local agencies simply lack the know-how because they lacked the means to find out what they were not doing while the state was not willing to tell them due to "home rule" laws.  This is made worse by the states who have small counties or have subdivided county government further into townships, boroughs and villages.  How is a township with 1,200 people going to know how to develop a traffic control plan or cheaply provide any public services on their own?  A traffic control plan would require a budget of as much as $100,000 to engineer and correct.  Pothole maintenance?  Does each town need their own grader, mower, plows and facilities?  Hiring a contractor would also be more expensive than just having multiple towns sharing the cost for these duties.  Most likely they would not even recognize these problems enough to even address them.

State systems could have been much larger than they were, and most states who adopted these large-scale state road systems mostly took an approach of relieving counties and not municipalities considering that most municipal governments are also of very low population.  This wave of state takeovers also largely didn't happen across New England, the upper Midwest, Rocky Mountains States and especially the West Coast.  Townships were completely untouched in all but Pennsylvania and Maine where the states took over at least 1/3 of the highway system.  States like Colorado backtracked on large-scale state takeover strategies early on with Florida, Alabama and Maryland also scaling back enormously in the 1970's and 1980's.  Blind support of local control remains king.

In addition, state DOT's are becoming very stubborn in regards to maintaining roads.  Consider the typical approach of state DOT's today that have nothing to do with actually creating a uniform, efficient and well-maintained road system.  These include:

  • Devolution 
    • This involves transferring a set amount or proportion of state-owned road mileage to local ownership to both construct and maintain)
  • Arbitrary mileage caps 
    • State sets a randomly chosen maximum number of miles or lane miles that they are willing to maintain and will not exceed that number
    • Does not allow a proportional ratio increase: mileage is set and ratio slowly declines
  • City maintenance contracts for state roads
    • State DOT entrusts a city to handle most or all routine maintenance on state-owned roads thus defeating the purpose of state control if the standards of the city do not meet or exceed state standards
  • Hands-off state-aid safety contracts
    • Projects are often as-is upgrades that forbid state inspections to review and make changes for local jobs
    • Problems in contracts are never fixed because there is no qualified inspector or PTOE on a local level to review and make changes to plans
  • Other moves by the state such as:
    • Leaving the entire planning of farm-to-market routes to the local government thus destroying the ability to properly connect roads to facilitate traffic across the state
    • Removing all directional guide signs and trailblazers directing traffic onto locally-owned collector and arterial roads meant to reduce liability on the state for traffic leaving the state system even if the road is otherwise properly constructed, properly maintained and is the shortest/best route
    • Inflexibility on unusually strict state standards that have nothing to do with safety designed expressly to force local governments to take over maintenance of stretches of road either just to get a road project completed that the state is unwilling to fund or because the project has conflicting priorities for roadway design that is not 100% in compliance with established state policy

All of the items listed above are primarily just an excuse for state DOT's to try to get out of the road maintenance business.  State DOT's are not a private for-profit corporation.  They are supposed to be representing the public good and work to make the road system better even if it means regulating, reducing or even eliminating direct local control on much of the road system.  They are the experts that state authorities defer to when transportation policy is formed, and if their policy was for higher standards or a greater state role with a reasonable plan, it is likely that the state government would listen to them over any other voices.  The attitude is instead increasingly becoming a view that the state should be exempt from any liability and that the state "cannot handle any more roads" as if that arbitrary mileage cap they set is some outrageous sum that is overwhelming the entire operation.  If they told the state government that turning certain responsibilities to local governments directly would most certainly lead to unsafe conditions but that they could help local agencies develop a regional cooperative approach to road maintenance, the state government would probably listen.

It is not that the states do not have the money to maintain a larger state highway system.  What it is is that they simply want to build roads and not actually have to maintain them doling out that responsibility instead to contractors and local governments.  The state DOT's themselves are also working against a strategy that brings better road standards to a far larger percentage of roads.  A big part of the proposals on this site are a way to work around this negative, short-sighted attitude by state highway agencies.  The hope is that if the state wants out of the road business that a middle ground can be developed between the larger state and smaller local agencies that can bridge that gap so that road quality is not sacrificed in the name of right-sizing state government.


WHAT SHOULD THE STATES BE DOING?

Today, the strategy should be more methodical.  Having states completely take over local road networks is no longer a practical or reliable strategy.  Nevertheless, complete control of roads on a municipal or county level should be reduced heavily.  Two approaches must be considered:

  • In the first approach, states should be taking over technical matters from local governments through the following ways:
    • An expansion of the state DOT in partnership with local agencies where local agencies jointly fund the state system expansion for maintenance while retaining control of construction funding
    • An expansion of the state DOT into a farm-to-market system with the state providing routine maintenance only, but limiting local government authority to both construct and maintain roads that are actually local in function
    • Swapping services with local agencies by providing technical services (traffic control planning, installation and limited maintenance) in turn for local agencies providing non-technical services (surface maintenance, mowing/brush cutting, winter maintenance)
  • The second approach has the state DOT not involved in local matters, but the state itself brokers a deal that encourages and allows local agencies across the state to form interagency maintenance cooperatives
    • This is combined on either a regional (based on regional planning districts) or statewide level (a statewide local roads cooperative)
    • May be combined for full road maintenance or traffic control
    • States should provide funding for engineering and operations as not only an incentive for local agencies to join a cooperative, but also as a means to combat local agency avoidance due to an operations fee that would be required otherwise

The federal-aid highway system in this country consists of 24% of the entire nation's highway system and roads of a functional classification higher than local comes to 30%, so an average of 19% is not excessive for state responsibility.  In fact, it is far too low when small cities and counties are otherwise responsible for 81% of the roads in the nation.  The chart below shows the federal-aid system mileage and ratios for the entire US.


The functional classifications of the US consists of five classifications, four of those which are eligible for federal-aid funding.  The federal-aid system consists of 24% of the nation's highway system with an additional 7% considered collector although not eligible for federal-aid.

The reality is that local governments have two primary functions: schools and roads.  Neither school nor road systems could even survive in such rural areas without constant state or federal aid, and that funding is never enough to bring either schools nor roads to acceptable standards except in newer states who did not adopt a 19th century model of local government.  Both schools and roads take a significant percentage of local funds, and neither roads nor schools benefit if the pie is carved up into small pieces when populations within those pieces of the pie are not very large.  If a state has 100 counties, and the average population is 20,000, the roads and schools in those counties below that average are going to have a difficult time meeting goals and standards.  Both are also grossly inefficient and substandard in areas with low populations or excessive government fragmentation such as in states who have both counties and townships.  If these local agencies were heavily sharing resources while maintaining primary local control it would make a big difference.  Is it such a bad idea to have regional school districts or regional road districts comprised of multiple cities, towns or counties?  Even some states or portions of states could adopt this strategy where the states are very small in land area such as in New England.  Our black and white state and local division is not an efficient use of resources.  That gray area should be full of cooperation to lower costs and improve standards.

WHY COMBINING LOCAL GOVERNMENT AGENCIES IS NOT THE ANSWER TO THIS PROBLEM

It has often been suggested that boundaries should be erased and that townships should be eliminated, counties merged or cities dissolved, but how often does this really happen?  Lots of talk has been given to this issue, but talk is cheap.  People like boundaries whether or not that boundary provides any actual services.  If you say you live in the town of Holtsville in Holt Township in Fairfield County, does it really matter if Holtsville, Holt Township or even Fairfield County provide every public service on their own or any at all?  Does it even matter if they exist except on paper?  North Carolina and South Carolina are full of townships, but they have no active government and provide no services.  It doesn't mean they do not exist.

People like their boundaries, so providing public services across borders where it makes sense is the ideal approach.  Other than that, the highest likelihood of local government reform, in fact, is the dissolving of townships in states who have active county governments duplicating services with townships.  The discussion of merging counties and eliminating low population municipalities, however, never gains sufficient traction to truly provide any benefit.  It is, in fact, a weak argument when most people do not support a complete loss of local control or identity.

Ideally, townships should be mostly dissolved, the formation and/or annexation of new cities and towns highly restricted, smaller cities and towns merged with adjacent larger ones or dissolved and counties should be a fluid function that is designed to efficiently reduce costs for the state.  On the last item, counties as functional entities should have no less than 100,000 residents effectively forcing low population counties to merge to form very large counties.  At this point, none of those ideas are either realistic or popular.  Was it realistic when Fulton County, GA merged with two other counties?  Today, the entire county is divided into 15 cities with county-level municipal services effectively dissolved meaning that local government consolidation was ultimately worthless.  What is realistic, however, is reorganizing specific government functions so that the role of counties, cities and towns is greatly reduced as a means to cut costs, improve standards and greatly increase spending power.
CONCLUSION

While no strategy is guaranteed to create a smooth, perfect road system, the concepts presented will help to eliminate structural inefficiency and poor standards that are directly the result of roadway responsibility divided up among too many parties.  While none of the ideas above involve a complete state takeover of any road, the strategies are designed to make sure that no road is left behind.  The solutions are common sense strategies, because they right-size responsibility so that not just roads but certain roadway functions are given to the public agency who is best equipped to handle it.  The concepts above also summarize and group together several of the main ideas from more detailed proposals discussed in earlier posts.  The idea is to use existing resources at existing levels and reorganize them in a way that is more beneficial.  All of these ideas are designed with the intent into permanently altering the relationship of states and local governments so that the traditional and ineffective division of responsibilities between states and very small local units of government is replaced with a larger, more engineer-driven system that creates universally higher standards at the least cost.